A fire that heats the house, not just the sofa

Custom fireplaces, wood and pellet stoves and tiled heaters, installed with the chimney work and the inspection report Czech law requires. We choose the type for your house, not from a catalogue.

Freesite visit and design
24 hreply on working days
Nationwidevetted local stove builders
Fireplace with a burning fire and a log niche in a family living room

What we build and install

Modern wood stove with glass door and log store

Wood stoves with installation

Cast iron or steel stoves sized to the room, flue pipe, chimney connection and the inspection report. Usually done in a day.

Fireplace with a fire in a cosy living room

Custom built fireplaces

A fireplace insert with a surround designed for the room: convection, accumulating or water heating. Plaster, firebrick, stone or tiles.

Historic green tiled stove in a classic room

Tiled and masonry heaters

Radiant heat for hours after the fire dies down. One or two loads a day. The right choice for tight, well insulated houses.

Compact stove in a bright modern interior

Pellet stoves and water heat exchangers

Thermostat controlled heat without carrying logs, or a stove that feeds your radiators and hot water through a buffer tank.

How it works

Site visit

Room, chimney, air supply, floor. Free, no obligation.

Design and quote

Type, output, insert, surround material. Itemised, final.

Chimney

Check, relining or a new stainless chimney.

Installation

Stove in a day, custom fireplace within about a week. Clean work.

Inspection and first fire

Flue inspection report, first fire together, how to burn properly.

Questions we get asked

Do I need a chimney inspection in the Czech Republic?

Yes. Before a new flue is put into service and whenever the appliance is replaced, a certified flue inspector must issue a revision report (Decree 34/2016). We arrange it as part of the job and hand you the report. A routine check and sweep then follows usually once a year.

Can you install a stove in a rented flat?

Only with the owner's consent and a usable flue for the flat. We check both at the site visit, including floor load for heavy stoves.

How long does it take?

A stove with flue pipe is usually done in one day. A custom built fireplace or a tiled heater takes two to seven working days plus drying time before the first full fire.

Which type suits a low energy house?

A slow heat release appliance: an accumulating fireplace or a tiled heater with an external air supply. Fast convection stoves overheat tight houses.

Do you work outside Prague?

Yes, across the whole country with vetted local stove builders. Site visits and design happen at your home.

Tell us about the room, we will come back with a plan

A few details are enough. We reply within 24 hours on working days with the next step, usually a free site visit and a chimney check.

Prefer to call? 775 654 443 (Czech and English)